starting the shed

I’ve spent the last couple of days hacking away the ivy invading from the scrubland behind, and propping up the decaying fence with angle irons. I’m sure that I told the shed errectors to leave a “generous foot to fifteen inches” between fence and the back of the shed – but it only seems to be about 10″ !

Full protective gear of boilersuit, eye protection, disposable gloves required for working with CreoCote in such a confined space – but the sides and back of the shed are now done. Much needed, as I couldn’t face doing it last year.

narrow gap at back of shed

Leave a Reply

Your email address will not be published. Required fields are marked *